Update from the Labs

So It’s been a crazy few weeks at the soon to open lab (First week of November)

so here are some pics:

Lab #2, getting PEX for Radiant heat
Lab #2, getting PEX for Radiant heat
Our Spiffy new 100,000 BTU Boiler/Hot Water Heater
Our Spiffy new 100,000 BTU Boiler/Hot Water Heater
Gravel going down before the concrete arrives on Wednesday
Gravel going down before the concrete arrives on Wednesday
Lab #1 gets Re-Bar before the concrete pour
Lab #1 gets Re-Bar before the concrete pour